Saturday, September 4, 2010

Concrete Progress

The changes since the last (see post) set of photos are not too dramatic.

The roofing is starting to go on:

There has also been a good bit of progress in the interior concrete. The garage floor now exists:

The base for the ground floor is also now in, as is the outline of the half-wall between the dining room and the rest of the living area:
The step down towards the bottom of the picture separates the 'breakfast nook' and the great room. The photo above was taken while standing in the great room. Here is the view of the great room from the breakfast nook:


Some areas that will be largely hidden are currently quite exposed. This is under the raised floor on the left of the photo above:
Note that plumbing is starting to go in; you can see a couple of pipes if you look closely. Here's a few more going from downstairs to upstairs:

Windows and drywall coming in the not-too-distant future.

No comments:

Post a Comment